Reporting a Shutdown or Maintenance Period

Reporting a Shutdown or Maintenance Period

When a plant shuts down, or an analyser is under maintenance or calibration, record it in TSC Enviro™ and tell the regulator through its own portal. LogicLadder can't mark it on the regulator portal for you, because it needs your industry login.

Steps

  1. In TSC Enviro™, add a maintenance event: select Data management > Maintenance mode and click + Add Maintenance. Click Here Choose Compliance as the purpose when the event concerns the regulator. See Recording Maintenance Events.
  2. Tell the regulator, using your industry login:
    1. CPCB ODAMS (new OCEMS portal): record the shutdown or maintenance on ODAMS, and respond to any alerts it raises during that time. If you are unsure where to record it, ask CPCB at cems.cpcb@nic.in.
    2. Old CPCB portal (RTDMS): log in to the industry login and use the "station offline reason" option next to your industry details.
    3. SPCB portals: follow that board's own process. Some boards ask you to update it in their own system.
  3. Keep your gateway powered during maintenance if you want data to keep flowing.
Record the event before the work starts, or as soon as possible. Unrecorded gaps lower your data availability and can lead to a notice. See Responding to a Pollution Control Board Notice.
After maintenance, check that readings are moving again. A constant data alert tells you if a reading stays stuck. See Creating a Constant Data Alert Rule.

Calibration

On-site calibration is done by your partner or analyser supplier. If your stations have remote calibration, See Using Remote Calibration.

What to send to support

You don't need to raise a ticket for routine maintenance. Email support if you want it on record, or if you need help with the regulator steps: include the station, the dates and the reason.

Related articles

  1. Recording Maintenance Events – add a maintenance, calibration or shutdown event.
  2. Using Remote Calibration – the remote calibration workflow and history.
  3. Creating a Constant Data Alert Rule – detect stuck or frozen readings.
  4. Responding to a Pollution Control Board Notice – get the evidence you need to reply to a notice about data gaps or exceedances.