Read these instructions before you install, power or service a CloudConnect gateway, and keep them for future reference.

Risk of electric shock. Always disconnect the mains AC supply before working on the gateway or its enclosure.
Safety instructions
- Follow all local and national electrical installation rules. A licensed electrician may be required to install or maintain the equipment.
- Install an external disconnect device for the mains supply and mark it clearly.
- Bond the conduit to protective earth (PE).
- Mount the gateway in the orientation shown on the device, and fit all cover screws. They are part of the safety rating.
- Do not connect a power supply to the RS-485 or 4-20 mA channels. This damages the channels.
- Do not short-circuit the output, and do not reverse the supply polarity.
- Lay sensor cables separately from high-voltage and power cables. Use a separate metal conduit or shielded cable.
- Do not use the gateway where explosive or flammable gases may be present.
- Use only the antennas, accessories and power supplies supplied or approved by LogicLadder.
- If the power supply shows signs of damage, switch off the power, disconnect it and contact support for a repair or replacement.
- Do not open or repair the gateway. It has no user-serviceable parts, and opening it voids the warranty.
Environmental and disposal instructions
- The gateway and its accessories contain no corrosive or environmentally damaging substances, apart from the internal battery.
- Lithium batteries are hazardous waste. Remove used batteries and dispose of them according to local rules.
- At the end of its life, do not dispose of the gateway with ordinary commercial waste. Send it for recycling as electronic waste. The product meets extended producer responsibility guidelines of the Central Pollution Control Board, India.
Related articles
- Installing and Powering Up a CloudConnect V5 Gateway – mount the gateway, place the antenna, insert the SIM and switch on.
- Connecting Meters and Sensors to a CloudConnect V5 Gateway – wire RS-485, 4-20 mA and Modbus TCP instruments.
- What's in the Box: Gateway, Power Supply and Antenna – what ships with each model and what you need to supply.