After you run a calculation, you can review its results, see how each figure was calculated and control whether it can still be changed.

Find a calculation

Select Emissions Calculation in the side menu of TSC CBAM Exporter. Click Here
The list shows each calculation's ID, name, approach, Accounting Period, number of CBAM Products, Status and number of CBAM Reports. Click the products count to see each product's total SEE and default SEE, or the reports count to see the reports created from the calculation.
The list shows calculations within the selected date range, which starts on your current accounting year. If you can't find a calculation, widen the date range.
StatusMeaning
DoneThe calculation is complete and can be used for reports.
Calculation PendingThe calculation has not been completed yet.
Run ErrorThe calculation could not be completed. Check the data and run it again.

View the results

Click the three-dot menu on a calculation and select View Calculation. The summary shows:
  1. the SEE Emissions, with the direct and indirect parts, in tCO2e/t
  2. Accounting Period & Products and Installation Details
  3. Emissions & Allocation Details: for each fuel, electricity source, precursor and process, the quantity consumed, the share used for CBAM products and the resulting emissions, and the quantity of each product produced
Click a fuel's emissions value to see exactly how it was calculated: the net calorific value, oxidation factor and biomass fraction, the emission factor database and version, the global warming potential, and the formula with your numbers filled in.
Share this calculation detail with your verifier. It shows the source of every factor used.
Click Generate Report to create a CBAM report from the calculation.

Locking

A calculation used by a report is locked, shown by a lock icon. While it is locked, Edit, Unlock and Delete are not available. This makes sure the figures in reports you have sent cannot change.
To correct a calculation that is already in a report, void the report first, then unlock and edit the calculation, and generate a new report.

Related articles

  1. Calculating CBAM Emissions – run an emissions calculation for an accounting period.
  2. Generating a CBAM Report – create the EU Communication Template or EFDA report.
  3. Downloading, Sending and Voiding CBAM Reports – share reports with customers and keep them up to date.
  4. Verification of Your CBAM Emissions Data – accredited verifiers, site visits and timing.