An energy budget is the energy you plan to use each month. TSC Energy compares actual consumption with it on the Energy dashboard and the Facility summary, and you can create alerts when consumption exceeds it.
Set your budget preference
First, choose whether budgets are set in kWh (active energy) or kVAh (apparent energy).
- Select the settings (gear) icon at the top of the page, then Budget. The Budget Preference page opens. Click Here
- Choose kWh or kVAh and select Save.

Once the budget preference is set, it cannot be changed. Choose kWh if you focus on active energy consumed, or kVAh if your utility bills on apparent energy.
Add monthly budgets
- Select Targeting and Planning > Energy Budget in the side menu of TSC Energy. Click Here
- Choose the year.
- Select + Add Budget.
- For each month, enter the budget Value and choose the unit under Select Unit. Use the same unit as your budget preference.
- Select Submit.
To add budgets from a spreadsheet, select Bulk upload, then Download template file. Fill in the template, upload it and select Submit.

Base your budgets on last year's consumption for the same month, adjusted for planned changes in production, occupancy or efficiency projects.
Related articles
- Energy, Temperature and Pressure Dashboards – consumption against budget, load, power factor and utilities.
- Creating Alert Rules in TSC Energy – instantaneous and periodic alerts on meter parameters.
- Analytics & Insights – energy accounting, distribution and annual analysis.