CBAM uses a specific vocabulary. Understanding these terms will help you set up TSC CBAM Exporter correctly and talk to your EU customers and verifier.

This article reflects the EU CBAM rules and Commission guidance as of October 2026. CBAM rules are still evolving, so always check the latest official documents linked at the end of this article.
Installation, process and route
| Term | Meaning | In TSC CBAM Exporter |
| Installation | A stationary technical unit (your plant or site) where a production process is carried out. | My Installation |
| Production process | The parts of an installation where chemical or physical processes produce goods with the same functional unit (normally the same CN code; tonnes of clinker for cement), within system boundaries set by aggregated goods category. | Process |
| Production route | The specific technology used in a production process, for example blast furnace or electric arc furnace for steel. | Production Route |
| System boundary | What is included when calculating embedded emissions: the direct emissions of the processes, indirect emissions where relevant, and the emissions of precursors. | Set by your processes and routes |
Goods and their codes
- CN code – the 8-digit EU Combined Nomenclature code of a product. It decides whether a product is covered by CBAM.
- Aggregated goods category – a group of CBAM goods and their CN codes used to define the system boundaries of production processes, for example "Crude steel" or "Cement clinker".
- Simple goods – goods made only from inputs and fuels with zero embedded emissions.
- Complex goods – all other goods. Their embedded emissions include those of their precursors.
- Precursor – an input material that is itself a CBAM good with embedded emissions, for example the crude steel used to make a steel product, or clinker used to make cement.

Precursors produced in the EU count as zero emissions, but their quantities must still be reported. If you buy precursors from other producers, ask them for their verified embedded emissions data, otherwise default values apply.
Emissions
| Term | Meaning |
| Direct emissions | Emissions from your production processes, including from the heat and cooling they consume. |
| Indirect emissions | Emissions from generating the electricity your processes consume. |
| Embedded emissions | The total emissions attributed to a product: direct emissions, indirect emissions where they count, and the embedded emissions of precursors. |
| Specific embedded emissions (SEE) | Embedded emissions per tonne of product, in tCO2e/t. This is the key figure your customer declares. |

In the definitive period, indirect emissions count only for cement, fertilisers and agglomerated iron ore. For other iron and steel goods, aluminium and hydrogen, only direct emissions count. You may still need electricity data, for example for reporting or for your customer's requests.
Monitoring
Emissions can be monitored using a calculation-based methodology, either the standard method (activity data multiplied by calculation factors) or the mass balance method (tracking the carbon in all inputs and outputs), or a measurement-based methodology (continuous emission measurement). You must document your methods in a written monitoring plan in English, which TSC CBAM Exporter calls the Monitoring Methodology Document (MMD).
The reporting period for an installation is normally the calendar year of production. A different period, such as your financial year, may be allowed if it lasts at least three consecutive months, is representative and is used consistently. Keep complete records for at least six years.
Related articles
- What Is EU CBAM? A Guide for Exporters – what CBAM is and why your EU customers need your data.
- Completing Your Monitoring Methodology Document (MMD) – document how your emissions are monitored.
- Creating a CBAM Process – define the inputs and outputs of a production process.
- Creating a Production Route – link products and processes to a standard CBAM route.
Official references
- Implementing Regulation (EU) 2025/2547 (calculation methodology)
- European Commission: Carbon Border Adjustment Mechanism